Nashoba F: Difference between revisions

From Acton Invasives Wiki
Jump to navigation Jump to search
No edit summary
No edit summary
Line 4: Line 4:


=== High Priority: clear bittersweet ===
=== High Priority: clear bittersweet ===
[[File:Nashoba-F.png|left|thumb|600x600px]]
[[File:Nashoba-F.png|left|thumb|450x450px]]
Area bounded by unmarked trail, wall 2, ridge, and line between South ends of wall 1 and wall 2.  There are maintenance trails along the ridge and wall 2 and the South boundary, and East-West maintenance trails connecting wall 2 and the ridge (as the area has a lot of tree-fall and is not easy to get around in).
Area bounded by unmarked trail, wall 2, ridge, and line between South ends of wall 1 and wall 2.  There are maintenance trails along the ridge and wall 2 and the South boundary, and East-West maintenance trails connecting wall 2 and the ridge (as the area has a lot of tree-fall and is not easy to get around in).



Revision as of 07:02, 4 December 2023

Nashoba Area F

Location

High Priority: clear bittersweet

Area bounded by unmarked trail, wall 2, ridge, and line between South ends of wall 1 and wall 2. There are maintenance trails along the ridge and wall 2 and the South boundary, and East-West maintenance trails connecting wall 2 and the ridge (as the area has a lot of tree-fall and is not easy to get around in).

Much Buckthorn. Some major Bittersweet infestations. Otherwise some Winged Euonymus, Japanese Barberry, Bush Honeysuckle.

Current Goals:

  1. Clear major Bittersweet.
  2. Clear large Buckthorn.
  3. Clear Bittersweet, Euonymus, Japanese Barberry, Bush Honeysuckle.
  4. Clear all Buckthorn.