Nashoba D1, D2: Difference between revisions

From Acton Invasives Wiki
Jump to navigation Jump to search
(Created page with "{{subst:Template:Work Area}}")
 
No edit summary
 
Line 1: Line 1:
= Nashoba Area A =
= Nashoba Areas D1 and D2 =


=== [https://trails.actonma.gov/map/?zoom=16.67&lng=-71.412926&lat=42.505051&m=[{%22t%22:%22Area%20A%22,%22x%22:%22-71.413199%22,%22y%22:%2242.505719%22}] Location] ===
=== [https://trails.actonma.gov/map/?zoom=16.42&lng=-71.411474&lat=42.504988&m=[{"t":"Areas%20D1,%20D2","x":"-71.411863","y":"42.504985"}] Location] ===


=== Medium Priority: regrowth only partly cleared ===
=== High Priority: particularly bittersweet and large buckthorn ===
[[File:Nashoba-D1-D2.png|left|thumb|Nashoba Areas D1 and D2]]




[[File:Nashoba-A-Map.png|alt=Map of Nashoba Area A|thumb|Nashoba Area A|left]]
Area as indicated by location and map.  The Blue Trail divides the outlined area into two areas, D1 and D2.
Area on the West side of the small bridge by the Pencil Factory, bounded by the Mill Channel and Nashoba Brook (part of which is just North of the Red Trail, though this is not shown on the map)There is Buckthorn, Bush Honeysuckle, Winged Euonymous, Bittersweet, Multiflora Rose, and Japanese Barberry.


Area is sunny.  There is poison ivy near the trails.
There is bittersweeth throughout, but it is particularly bad at the middle of wall 1 and South of wall 4.
<br clear=all>
2022: Southern half area, what is near or downhill from the Bench, was cleared by Bob Walton.


2023: Part of Southern area South of Path re-cleared by Bob Walton.
There is buckthorn throughout, but it is particularly bad in the North half of D2.
 
The is some Japanese Barberry, Winged Euonymus, and maybe others.
<br clear="all">2022-23 Some clearing, Bob Walton.


Current Goals:
Current Goals:


# Clear re-growth in previously cleared Southern half.
# Clear bittersweet and large buckthorn.
# Clear previously uncleared Northern half.
# Clear rest.

Latest revision as of 13:19, 19 November 2023

Nashoba Areas D1 and D2

Location

High Priority: particularly bittersweet and large buckthorn

Nashoba Areas D1 and D2


Area as indicated by location and map. The Blue Trail divides the outlined area into two areas, D1 and D2.

There is bittersweeth throughout, but it is particularly bad at the middle of wall 1 and South of wall 4.

There is buckthorn throughout, but it is particularly bad in the North half of D2.

The is some Japanese Barberry, Winged Euonymus, and maybe others.
2022-23 Some clearing, Bob Walton.

Current Goals:

  1. Clear bittersweet and large buckthorn.
  2. Clear rest.